The DMRC said that, to minimise passenger inconvenience, restoration work had been carried out over night after the end of revenue service. | Photo Credit: File photo An attempted theft of signal cables damaged the signalling system, affecting services on the Delhi Metro Airport Express Line between Dhaula Kuan and Shivaji Stadium, stated a DMRC release on Sunday morning. Although the cables were cut during the attempted theft, the thieves could not take the cut pieces, which were found near metro pillar number 9 during inspection. The cable theft has disrupted the signalling system, and trains were restricted to a speed of 25 kmph in the affected section between Dhaula Kuan and Shivaji Stadium stations on the up line towards New Delhi,” the DMRC said in a statement. The DMRC said that, to minimise passenger inconvenience, restoration work had been carried out over night after the end of revenue service. Published – January 12, 2026 01:30 am IST Share this: Click to share on WhatsApp (Opens in new window) WhatsApp Click to share on Facebook (Opens in new window) Facebook Click to share on Threads (Opens in new window) Threads Click to share on X (Opens in new window) X Click to share on Telegram (Opens in new window) Telegram Click to share on LinkedIn (Opens in new window) LinkedIn Click to share on Pinterest (Opens in new window) Pinterest Click to email a link to a friend (Opens in new window) Email More Click to print (Opens in new window) Print Click to share on Reddit (Opens in new window) Reddit Click to share on Tumblr (Opens in new window) Tumblr Click to share on Pocket (Opens in new window) Pocket Click to share on Mastodon (Opens in new window) Mastodon Click to share on Nextdoor (Opens in new window) Nextdoor Click to share on Bluesky (Opens in new window) Bluesky Like this:Like Loading... Post navigation Mercury to drop to below 3 degrees Celsius, IMD issues alert for ‘cold wave conditions’ From The Hindu Archives, January 12, 1976: Drastic steps to check rise in population