The Railways has decided to continue the temporary augmentation of five coaches on Train NO. 16595/596 KSR Bengaluru-Karwar-KSR Bengaluru till May-end.

A release from Konkan Railway Corporation Ltd., here said, as against the original composition of 14 LHB coaches, one composite (first AC and 2-tier AC), one 2-tier AC, one 3-tier AC, seven sleeper class, two general second class, and one each luggage-cum-brake van and generator coaches, the revised composition would have 19 LHB coaches.


Leave a Reply

Your email address will not be published. Required fields are marked *