The 13.15 km track between railway manufacturing unit in Kazipet and main rail network was completed. | Photo Credit: Handle @RailVikas on X Rail Vikas Nigam Limited, which is developing a railway manufacturing unit in 160 acres of area at Kazipet in Telangana, recently completed a successful diesel train trial run on a 13.15 km track to connect the factory to the Indian Railway network. Officials said that the track was laid between the factory and the Kazipet Railway Station so that manufactured coaches can be brought to the station and then delivered to various railway zones and divisions. Kazipet RMU-railway network track completion “The trial run marks the completion of track connectivity between the RMU (Rail Manufacturing Unit) complex and the main railway network, formally integrating the facility with the operational system of Indian Railways and signalling the project’s transition from construction to operational readiness ahead of commissioning in March,” a press note from RVNL said. It added, “The Railway Manufacturing Unit at Kazipet is being developed as a major rolling stock manufacturing and industrial facility to augment the production capacity of Indian Railways. Spread across 160 acres, the project is being executed by RVNL as the Project Implementation Agency.” Officials said that strategically located at Kazipet, a major junction under South Central Railway on the vital Balharshah–Secunderabad trunk route forming part of the larger Delhi–Chennai corridor, the RMU offers seamless north–south and east–west connectivity, enabling efficient dispatch of finished rolling stock across the country and strengthening the national rolling stock manufacturing ecosystem. Machinery and plant installations completed Saleem Ahmad, Chairman & Managing Director, RVNL, said, “The successful trial run and integration of the Railway Manufacturing Unit at Kazipet with the main railway network marks a defining milestone in the execution of this project and will strengthen India’s railway manufacturing infrastructure.” The press note said that machinery and plant installations in the main shop, paint shop and test shop have been completed and are slated for commissioning by March 2026. “The RMU has also been designed as a green-rated industrial complex incorporating a 2 MWp rooftop solar plant with grid export capability, four rainwater harvesting ponds of 20 lakh litres each, energy-efficient LED lighting and a modern sewage treatment plant. The use of PEB structures supports faster construction, optimal daylight utilisation, lower maintenance and reduced energy consumption, reinforcing sustainable industrial development at Kazipet,” it added. Published – February 24, 2026 01:01 pm IST Share this: Click to share on WhatsApp (Opens in new window) WhatsApp Click to share on Facebook (Opens in new window) Facebook Click to share on Threads (Opens in new window) Threads Click to share on X (Opens in new window) X Click to share on Telegram (Opens in new window) Telegram Click to share on LinkedIn (Opens in new window) LinkedIn Click to share on Pinterest (Opens in new window) Pinterest Click to email a link to a friend (Opens in new window) Email More Click to print (Opens in new window) Print Click to share on Reddit (Opens in new window) Reddit Click to share on Tumblr (Opens in new window) Tumblr Click to share on Pocket (Opens in new window) Pocket Click to share on Mastodon (Opens in new window) Mastodon Click to share on Nextdoor (Opens in new window) Nextdoor Click to share on Bluesky (Opens in new window) Bluesky Like this:Like Loading... Post navigation More than 100 C-suite Retail Leaders to Speak at NRF 2026 APAC Helicopter carrying seven crashes into sea near Andaman’s Mayabunder, all rescued